Quality
Quality management system
Quality is not inspected at the end — it is built into every stage. Each key activity carries mandatory hold points that cannot be bypassed without sign-off.
Project lifecycle
- 01
Tender study & pricing
Drawing and BOQ analysis, site visits, and realistic engineering pricing that protects the project from setbacks.
- 02
Planning & mobilization
Approved schedule, resource and equipment plan, safety and quality plan, and site setup within the contractual mobilization period.
- 03
Execution & monitoring
Execution to specification with daily and weekly photo-documented reports, and regular progress meetings with the client and consultant.
- 04
QC & inspections
Work/Material Inspection Requests (WIR/MIR) for every stage, lab and field testing, and immediate closeout of observations.
- 05
Provisional handover
Snag-list compilation and resolution, final As-Built drawing handover, and warranty certificates.
- 06
DLP & maintenance
Full commitment through the Defects Liability Period, with an emergency maintenance response team within 48 hours.
Hold points & tests
| Activity | Hold points & tests |
|---|---|
| Earthworks | Approved levels — FDT compaction test per layer |
| Asphalt | Approved mix — temperature check — core test after compaction |
| Wet utilities | Bedding and slope inspection — pressure/leak test before backfill |
| Concrete | Formwork and rebar inspection before pour — test cubes per pour — curing documentation |
| Steel structures | Shop-drawing approval — weld inspection — bolt torque — coating thickness |
| MEP | Network pressure test ×1.5 — Megger insulation test — inspection before ceiling closure |
| Waterproofing | 48-hour flood test for bathrooms and roofs before covering |
| Finishes | Sample and mock-up approval — staged handover per item — final snag closeout |
Warranties
Structural frame
10 years
Per Saudi contracting law and its executive regulations
Waterproofing works
5–10 years
Per system used, plus manufacturer warranty
MEP works
1–2 years
Equipment covered by authorized agent warranties
Finishes
1 year
Defects Liability Period with immediate rectification
Contracting models
Full execution — supply & apply
- Complete supply and execution with contractor's materials
- Single point of responsibility
- Best fit for owners and government entities
Specialized subcontracting
- Specialized packages for the main contractor's benefit
- Full compliance with project quality and safety systems
- Experience coordinating with consultants
Turnkey delivery
- From design and permits to a ready-to-use handover
- Full management of supply, trades and schedule
- Comprehensive warranties and a complete handover file
Labor-only / apply-only
- Execution with client-supplied materials, under our supervision
- Transparent pricing by item or by meter
- Maximum flexibility for owner-managed projects